Drop the model. Pick the test. Read the result.
On the sample model the index is 0.79, with 1,219 of 1,245 elements tested: 979 passed, 240 failed and 26 untested.
Information first. The tables lead. The 3D view shows where.
- 334 of 334 of buildingSMART's IDS test cases, checked on every change
- Untested is never Pass
- 5 models in one check, with one index
- BCF 2.1 issues, each with a picture
Validated against buildingSMART's IDS test cases on every change, and BCF 2.1 files that pass its schemas.
Built on IFC Lite, an open source engine (MPL-2.0).
Who it is for
Clients
Write the requirements, check every delivery.
Designers
Run the client's checks before you hand over.
Contractors
Check as-built and COBie handover models.
What it does
Start from public requirements. Pick one and check.
COBie and sets for Latvia, Lithuania and Estonia, each with its phases. The library is small today and growing.
The list of public tests on the Check page: COBie, with its phases, and the sample checks. A test is picked, and the check is ready to run.
Build an IDS without knowing IFC. Rules in plain words, in minutes.
Pick walls, doors or spaces, take the values from your model, or paste the rows from Excel.
The IDS editor's table of rules, one row each for walls, doors and spaces with how many elements of the sample model each passes and fails, and at the end a file that passes the IDS checks, ready to download.
Reports are built in. From the manager's board to the modeller's table.
The analytical view, 3D and pictures, detail tables. Present it full screen, export the results.
One result seen three ways: the analytical view with the big numbers for managers, the 3D view for coordinators and the table of elements for modellers, and the files it exports: BCF, Excel and CSV.
Issues, not spreadsheets. Straight to the designer.
Each issue names its elements and carries a picture, so nobody hunts for an ID in Excel.
Three failing walls ticked in the table and added to a BCF draft, then the issue that comes of them, with the elements it names and a picture that outlines them in the building.
One file for the client and the team.
- The client writes the requirements
- Designers and contractors check first
- The client checks the delivery
- Failures go back as BCF issues
Questions
What do I need to start?
An IFC model and a test: a public one, your own IDS file, or one you write in the IDS editor. Or try the sample model.
Is there an account to create?
No. Add a model, choose a test and run the check. No account or e-mail address is needed.
What does a result rest on?
An engine that gives the specified result on all 334 of buildingSMART's IDS test cases, checked on every change, and an index that always says how many elements were tested.
Can I check several models together?
Up to five in one check, on one Results page with one index for all and one 3D view.
What can I send to the team?
BCF 2.1 issues from the rows you pick, each with a picture, and the whole result as an Excel workbook or a CSV file.
Check a model now
Add an IFC model, or try the sample model.